Uploaded image for project: 'CDAP'
  1. CDAP
  2. CDAP-10957

Allow users to set max concurrent runs of Batch Hydrator pipeline

    Details

    • Type: Improvement
    • Status: Resolved
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 4.2.0
    • Component/s: Pipelines, UI
    • Labels:
    • Sprint:
      UP4 Sprint 4
    • Release Notes:
      Added a pipeline setting to limit the max number of concurrent runs, when launched by the scheduler.
    • Rank:
      1|hzy13a:s9c

      Description

      When creating a Schedule for a workflow in CDAP, we allow users to specify RunConstraints (to specify maximum concurrent runs). This would allow users to control the number of concurrent runs of the batch pipeline and thus not allow it if required by setting it to 1.

        Attachments

          Activity

            People

            • Assignee:
              tbach Tony Bach
              Reporter:
              gokul Gokul Gunasekaran
            • Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: