Uploaded image for project: 'CDAP'
  1. CDAP
  2. CDAP-11912 Implement program status based scheduling
  3. CDAP-12382

Event payload passing between triggering pipeline and triggered pipeline

    Details

    • Type: Sub-task
    • Status: Resolved
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 4.3.0
    • Component/s: CDAP, Scheduler
    • Labels:
      None
    • Release Notes:
      Added the capability of using plugin properties and runtime arguments from the triggering data pipeline as runtime arguments in the triggered data pipeline.
    • Rank:
      1|i006lb:

      Description

      We need to provide a mechanism for passing information between the triggering pipeline and triggered pipeline based on the program status based scheduling, and the triggered pipeline can also access the desired information from the triggering pipeline. For instance, the triggered pipeline needs to get a workflow token from a certain node in the triggering pipeline. Triggered pipeline can also get runtime arguments and stage configurations from the triggering pipeline

      Design: https://wiki.cask.co/display/CE/Pipeline+Payload+Passing

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                mao Chengfeng Mao
                Reporter:
                mao Chengfeng Mao
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: