Uploaded image for project: 'CDAP'
  1. CDAP
  2. CDAP-13052

Configure and Schedule a new version of an existing pipeline

    Details

    • Type: New Feature
    • Status: Open
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: 7.0.0
    • Component/s: UI
    • Rank:
      1|hzy4gu:zzzzzzzzzzzo6

      Description

      Configure and Schedule
      A new version of the pipeline doesn't carry forward Logs, Metrics, Metadata, Run history, Schedules, Authorization Policies of the previous version.
      Pipeline configurations are not inherited from a previous version and need to be inputted by the user.
      The user can import directly the schedule and triggers into the new version, by selecting the option: "Use schedule and triggers from the previous version" in the Schedule drop down.
      When I create a new pipeline, the schedules of the older pipeline should be disabled, so that no new runs start with the older version of the pipeline.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                edwin Edwin Elia
                Reporter:
                lea Lea
              • Votes:
                1 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated: