Details

    • Type: Sub-task
    • Status: Resolved
    • Priority: Major
    • Resolution: Duplicate
    • Affects Version/s: None
    • Fix Version/s: 3.5.0
    • Component/s: Pipelines, UI
    • Labels:
      None
    • Release Notes:
      Re-organizes batch pipeline settings to top panel to schedule batch pipeline, add post run actions & set pipeline resources, engine.
    • Rank:
      1|hzz8zz:

      Description

      As a user, I can schedule a pipeline using basic setting or a Cron Expression so that I can control the frequency of runs.

      Details:
      1. User navigates to Pipeline Configuration; 'Basic' drop-down in the 'Schedule' tab is displayed.
      2a. 'Cron Expression' and caret symbol are displayed.
      2b. User may click the caret to open the Cron Expression input.
      3a. If the user sets the Cron Expression, then the Basic drop-down displays the appropriate setting.
      3b. If the Cron Expression is open and the user uses the Basic setting to set the frequency, then the Cron Expression displays the appropriate setting.

        Attachments

        1. Panel4.0.jpg
          Panel4.0.jpg
          192 kB
        2. Panel4.1.jpg
          Panel4.1.jpg
          201 kB
        3. Panel8.jpg
          Panel8.jpg
          185 kB

          Issue Links

            Activity

              People

              • Assignee:
                ajai Ajai Narayan
                Reporter:
                brady Brady Ajay
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: